Providing world-class engineering to the power generation industry for 40 years

Current Projects

Energy Facility, Carroll County USA

Power Plant, Co.Mayo, Ireland

Sabine Pass LNG, Louisiana, USA

April 2016 - present

700MW natural gas fired combined cycle power plant owned by Advanced Power and located in Carrollton, Ohio, USA. Project Info
Services Provided
  • Provision of fully integrated APC construction team responsible for erection, installation & pre-commissioning of GE supplied turbine equipment & BOP
  • APC site team comprised of construction management, mechanical field engineers, and material management in support of Bechtel and its JV partner Sterling Boiler
  • Day to day direction provided by APC supervisors to Union craft labor

May 2016 - present

40MW Biomass power plant located in Killala, County Mayo, Ireland. Turnkey installation of 1 No. GE supply 40MW Steam Turbine SC2-15 with a 40MW Foster Wheeler Biomass fuelled vibrating grate stoker boiler. Project Info
Services Provided
  • Turnkey installation of 1 No. GE SC2-15 40MW Steam Turbine and all auxiliary equipment incl lube oil, Vacuum group, Condensing unit, Gearbox, Acoustic enclosure, Generator & Cooler, Instrument and Control System Installation, full commissioning and long term service/maintenance agreement.
  • Fully self-implemented erection of one Foster Wheeler 40 MW Biomass fuelled vibrating grate stoker boiler.
  • Complete installation of all ash handling system and all flue gas filtration systems. Commissioning of all Installed equipment.

March 2014 - present

Construction of LNG export terminal in Cameron Parish Louisiana, USA owned by Cheniere Partners comprising up to six (6) trains with expected nominal production capacity of approximately 27.0 mtpa of LNG. Each train is comprised of six (6) GE Nuovo Pignone PGT25+ gas turbines and fourteen (14) GENP centrifugal compressors. Project Info
Services Provided
  • Multi-year project with provision of a fully integrated APC supervisory team comprised of construction management, mechanical, electrical, and field engineering personnel.
  • APC site team has responsibility for installation, alignment & pre-commissioning of all GENP supplied equipment, in coordination with Bechtel and GENP site management.
  • Day to day direction provided by APC supervisors to Bechtel supplied craft labor.
  • Erection and installation of all other Auxiliary/BOP equipment as well as process pipe alignments.
  • Additional APC support provided to Bechtel during turnover and commissioning phase.

We have a proud & successful 40 year track record

Black Point

Hong Kong
Through careful planning and execution, we undertake complex projects with total confidence.

Qurayyah

Kingdom of Saudi Arabia

Sabiya

Kuwait

Connah's Quay Project

UK

Great Island

Co. Wexford, Ireland
“In addition to making the schedule, APC responded to some late design changes and did it all with zero lost time accidents.”
Koray Ozturk
Site Engineer, GAMA Power Systems
“In addition to making the schedule, APC responded to some late design changes and did it all with zero lost time accidents.”
Koray Ozturk
Site Engineer, GAMA Power Systems
“In addition to making the schedule, APC responded to some late design changes and did it all with zero lost time accidents.”
Koray Ozturk
Site Engineer, GAMA Power Systems